Frac flowback and production test vessels.
Stack Production Testing has a number of test vessels and equipment as well as the personnel to ensure our clients satisfaction. We have a dedicated staff to maintain and monitor all of our equipment life cycle.
Features for the production test vessels include:
- 250 psi -2000 psi MAWP
- 8 m3 – 45 m3 volume
- 4 phase separator
- 4” senior Daniels meter run w/ Barton chart recorder
- 1.5″ – 4″ V-cone with real time monitoring
- 2” or 3” (optional) shipping line
- 3” flare and PSV line
- Fully pneumatic shipping & digital fluid metering (inline) system, Skid or Trailer mounted units
- Duel Gas Out
- Built-in LEL Monitor Alarm